Servicing the entire Sunshine Coast from Caboolture to Gympie

Mt Ninderry Meats

Case Study

Brief

  • Replace the existing inefficient and poorly effective ducted AC unit with a new low profile preparation area refrigeration system.
  • Provide desired temperatures of 13-15degs and low humidity
  • Minimise disruption to trade and keep total project time within 1 week.

Details

  • Remove all existing damaged ceiling plaster board and electrical
  • Install 50mm insulated panel ceiling and all new lights and electrical

Outcome

  • Achieved all goals and exceeded customer expectations regarding temperatures and dryness of the new room.
  • Reduced energy bills
  • Reduced maintenance and cleaning requirements.
  • Completed all works and handed over site clean, tidy and 1day early.